eprocurement tenders
9311-33-4141
Search
construction of lane major tender
delhi , delhi
construction
of new six
lane
access controlled capital region ring road from rameshwar (nh 16) to bilipada from km 0.000 to km 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)
Authority : National Highways Authority Of India
Deadline : 10 Jan 2025
Value :
1715.31 Crores
Download
delhi , delhi
construction
of new six
lane
access controlled capital region ring road from rameswar (nh 16) to gobindpur package ii from design ch. km. 40.700 to km. 70.995 in the state of odisha under nh(o) on hybrid annuity mode
Authority : National Highways Authority Of India
Deadline : 14 Jan 2025
Value :
1402.64 Crores
Download
delhi , delhi
construction
of 4
lane
with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Authority : National Highways Authority Of India
Deadline : 31 Jan 2025
Value :
1381.42 Crores
Download
delhi , delhi
construction
of new 4
lane
access controlled highway from cuttack (end point of crrr at nh 16 near tangi) to kandarpur on sh 12 from design ch. 0.000 km to 21.225 under nh(o) on hybrid annuity mode in the state of odisha
Authority : National Highways Authority Of India
Deadline : 06 Feb 2025
Value :
968.83 Crores
Download
delhi , delhi
construction
of 4
lane
elevated road in jodhpur city portion from mahamandir ch.0.000 to akhaliya chouraha ch.7.633) in rajasthan on ham under nh(o) scheme
Authority : National Highways Authority Of India
Deadline : 01 Jan 2025
Value :
938.59 Crores
Download
delhi , delhi
construction
of new 4
lane
with paved shoulder from dareota village to kalar bala village of nh-205 (design chainage km.33.175 to km 41.000 design length 7.825 km) including twin tube tunnel packageiib in himachal pradesh under nh (o) on ham
Authority : National Highways Authority Of India
Deadline : 08 Jan 2025
Value :
622.00 Crores
Download
himachal pradesh , spiti
improvement
construction
of existing cl 5 road to nh intermediate
lane
specification with hard shoulder from existing km 00 000 to km 75 991 design km 00 000 to km 73 830 design length 73.830 km of nh 505 sumdo kaza gramphoo road in the state of hp.
Authority : Ministry Of Road Transport And Highways
Deadline : 31 Dec 2024
Value :
433.87 Crores
Download
delhi , delhi
construction
of 6
lane
zirakpur bypass (pkg i) (starting from junction with nh 7 (zirakpur patiala) (design ch. 0.000) and ending at (design ch. 8.500) near kishanpura (total length 9.800 km) in punjab under nh (o) on ham
Authority : National Highways Authority Of India
Deadline : 02 Jan 2025
Value :
350.20 Crores
Download
delhi , delhi
construction
of two
lane
with paved shoulder of jhabua petlawad section of nh 147 e in the state of madhya pradesh on epc mode.
Authority : National Highways Authority Of India
Deadline : 06 Feb 2025
Value :
313.91 Crores
Download
rajasthan , udaipur
construction
of two
lane
to four
lane
road with paved shoulder from mangalwar km. 0/00 to km. 37/225 nimbahera junction nh 56 (total length 37.225 km.)
major
district road (mdr 11 a) in district chittorgarh on epc mode (excluding gst)
Authority : Rajasthan State Road Development And Construction Corporation Limited
Deadline : 30 Jan 2025
Value :
197.20 Crores
Download
delhi , delhi
construction
of 4-
lane
greenfield highway from chatrapur on nh-16 to gopalpur port km 0.000 to km 4.500 and upgradation to 6-
lane
elevated configuration of existing nh-16 km 429.025 to km 430.990 under bharatmala pariyojna in the state of odisha on
Authority : National Highways Authority Of India
Deadline : 02 Jan 2025
Value :
166.98 Crores
Download
maharashtra , bassein
construction
of
major
bridges, rob at vasai, vehicle subway, minor bridges, drain and earthwork in formation in connection with 5 th and 6 th line between borivali virar in mumbai suburban section under mutp iiia
Authority : Ministry Of Railways
Deadline : 28 Jan 2025
Value :
135.92 Crores
Download
jharkhand , churchu
construction
of six
major
composite girders bridges in connection with
construction
of rail infrastructure facilities proposed between danea railway siding kedla washery for kotre-basantpur-pachmo coal mines of ccl siding hazaribag, pkg-iii
Authority : Rites Limited
Deadline : 16 Jan 2025
Value :
114.93 Crores
Download
chhattisgarh , narayanpur
construction
and up gradation to two/four
lane
with paved shoulder in km 80.720 to 90.990 total length 10.270 km narayanpur- kasturmeta - kutul road of nh-130 d (part-ii)
Authority : Ministry Of Road Transport And Highways
Deadline : 20 Jan 2025
Value :
90.50 Crores
Download
chhattisgarh , narayanpur
construction
and up gradation to two/four
lane
with paved shoulder in km 70.450 to 80.720 total length 10.270 km narayanpur kasturmeta - kutul road of nh-130 d (part-i)
Authority : Ministry Of Road Transport And Highways
Deadline : 20 Jan 2025
Value :
89.96 Crores
Download
punjab , jandiala
construction
of 6 -
lane
elevated structure extension in rayya at km. 420.070 on jalandhar-amritsar section of nh-03 with service road on both sides including approach for rectification of blackspot in the state of punjab on epc mode.
Authority : National Highways Authority Of India
Deadline : 21 Jan 2025
Value :
87.32 Crores
Download
orissa , bhubaneswar
construction
of four
lane
road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Authority : Ministry Of Road Transport And Highways
Deadline : 01 Feb 2025
Value :
73.56 Crores
Download
orissa , bhubaneswar
construction
of four
lane
road over bridge (rob no. 357) on new b.g. line from khurda road to bolangir and its approaches at km. 156/088 (village- baringi) of nh-57 in the state of odisha on epc mode
Authority : Ministry Of Road Transport And Highways
Deadline : 31 Jan 2025
Value :
70.26 Crores
Download
orissa , bhubaneswar
construction
of four
lane
road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Authority : Ministry Of Road Transport And Highways
Deadline : 05 Feb 2025
Value :
65.59 Crores
Download
maharashtra , nagpur
construction
of the 6
lane
vup 1x 220 m with slip road from km 467.400 to km 469.200 of durg -nagpur section of nh-53 (old nh-6) in manegaon village in the state of maharashtra on epc mode
Authority : National Highways Authority Of India
Deadline : 22 Jan 2025
Value :
55.69 Crores
Download
1
2
3
4
5
6
Next
eprocurement tender from :
delhi
||
spiti
||
udaipur
||
bassein
||
churchu
||
narayanpur
||
jandiala
||
bhubaneswar
||
nagpur
Free Registration / Login
Subscribe / Membership
Digital Signature Certificate
Tender Alert Service
Tender Bidding Consultancy
NSIC Registration
Gem Registration Service
MSME / Udyam Registration
ISO Registration
Digital Signature (DSC)
Tender Training Program
Gem Training Program
Vendor Registration
Tenders by Value
Not Specified
1 - 10 Lakh
10 Lakh to 1 Crore
1 to 10 Crore
10 to 100 Crore
Above
100 Crore
Classified Tenders
Buy
Sale / Auction
Empanelment
Work Contract
Appointment
Pre Qualification
Expression of Interest
Service Contract
Most Popular Tenders
tripura tenders
construction of foundations fp tenders
building construction tenders in mumbai
health maharashtra tenders
public works department bhor maharashtra tenders
More
Common Message